Project Goals
This project included the removal and replacement of all flooring, lighting, and wall coverings across all residential levels. Notably, the penthouse floor received a distinct design treatment, setting it apart from the common resident floors.
As with all our condominium projects, we approached this renovation with a deep respect for the fact that, while working in shared spaces, we were still in the residents’ homes. Our team takes great pride in delivering high-quality results while minimizing disruption to residents, maintaining a clean, respectful, and well-communicated work environment throughout the duration of the project.
Project Scope
- Removed all existing flooring at the elevator lobbies on the 4th floor and garage level to replace with porcelain flooring
- Installed new carpeting on all resident floors, with the penthouse having a distinguishable look
- Removed all wall coverings to skim coat and install new wall coverings
- Lighting upgrades consisted of new fixtures and LED bulbs on all levels
CLIENT TESTIMONIALS
“Capital was thorough, quick, and responsive throughout the entire project. They went above and beyond the normal call of duty to make the project as unobtrusive as possible to our residents. If you have any minor issues after the job is completed, you will never have a problem getting Capital to come back and rectify any situation. Justin and team were very communicative and we would welcome them to come back and bid on any other work we need.” – Dino Zaharopoulos, Board President